Summer 2001 docking
M/s Alpo being prepareted
for the docking frame. |
The diver must carefully check the frame and the underwater rails for stones and other obstacles before the winch is turned on. |
The winch operator is
patiently waiting for a signal |
M/s
Alpo on the frame during the first minutes of lifting. |
The
ice-breaking bow of M/s Alpo.
|
The
ice bow cleaned and painted.
The draught shown in English feet (~30 cm). Anchor chains are painted and marked for every 5th fathoms (~180 cm). |
Summer 2002 docking
The rear of M/s Alpo around the propeller. |
The main engine's cooling water inlet being reopened. The inlets were blocked with steel plates when the tug's work ended and it was left idle in 1991. |
© Copyright Timo Iik 2011 | http://www.toppilanpukseeri.fi | 27.11.2011 11:24:49 +0200 |